One Angel Court

London

Value: £2.6m

Services Provided: Principal Contractor & Planning

MiCiM were Principle Contractor as a turn key package with a well known generator contractor having full design responsibility for the design, installation, commissioning and handover of a new 3MVA prime rated generator set to supplement the existing generator set in the basement B2 generator room at One Angel Court.

The new set was installed in component sections due the access routes which required the opening of an existing soft spot provided in the loading bay slab. The works included the installation of the flue, silencers and catalytic converter for the new set as well as discharge air attenuation. A new 31,000l oil tank was also installed adjacent the existing oil tank in the B2 oil tank room.

All of this was carried out whilst the loading bay stayed open to serve the live building.

People involved on this project

Adam Matthews

Construction Manager

John Beattie

M&E Manager

Chris Jarman

Construction Director

Daniel Potter

Commercial Director

> WordPress Cookie Notice by Real Cookie Banner